Building bench111
Name of the building
|
building1
|
Select facility lifecycle stage
|
3
|
Select project phase
|
321
|
Select main function of the building
|
123
|
Give number of storeys, average value used when required
|
132
|
Virbal description of oc
|
321
|
Strategy objectives to energy design
|
321213
|
Total floor area of the building on all fools including exterior and interior walls
|
21
|
Total floor area of the building on all fools excluding exterior and interior walls
|
231
|
Total volume(area and height)of the building
|
231
|
Amount of persons that use the building
|
213
|
Proportion of the vacancy in the building
|
231
|
year when building has been construct
|
21
|
year when building has been renovate or parts added to existing building
|
21
|
Select Country where facility is Located
|
213
|
Postal address to building site
|
67
|
select region characteristics from the list
|
876
|
Map latitude value
|
456
|
Map longitude value
|
45
|
Unique registry identifier of the plot
|
34
|
total area of the site
|
3
|
Building efficiency and density
|
35
|
Property value
|
5
|
Profitability
|
543
|
Cost Impact
|
67
|
investment
|
657
|
Operation Cost
|
456
|
LCC
|
45
|
LEQ
|
3
|
Indoor air quality
|
54
|
Thermal comfort
|
765
|
Visual comfort
|
78
|
Acoustic comfort
|
tz
|
Health & Safety
|
zut
|
Energy system performance
|
543
|
Accessibility
|
435
|
Positive stimulation
|
543
|
maintainability
|
435
|
Climate change
|
435
|
CO2
|
543
|
Waste
|
435
|
Resource depletion
|
43
|
Non-renewable primary energy
|
43
|
Non-renewable materials
|
re
|
Water(embodied and in-use
|
0
|
Energy
|
43
|
Energy balancing
|
98
|
Peak power need
|
89
|
Storage capacity
|
98
|
Quality
|
657
|